Coventry Stays
Industry

JLR in 2025 and 2026: what changed

Few employers matter more to Coventry than Jaguar Land Rover. Here is what happened at its Midlands sites between 2025 and the autumn of 2026.

Researched and written 17 October 2026. Sources are listed at the end.

A stop and a restart

A cyber incident stopped JLR's manufacturing in the autumn of 2025. The company's phased restart began on 8 October 2025 at the Electric Propulsion Manufacturing Centre near Wolverhampton and the Battery Assembly Centre. Staff went back to the stamping operations at Castle Bromwich, Halewood and Solihull the same week.

Alongside the restart JLR set up a financing scheme to pay qualifying suppliers early while production came back.

The Range Rover Electric

In September 2026 JLR unveiled the Range Rover Electric at Solihull, where it is built: the brand's first fully electric model in its 56-year history. The Greater Birmingham Chambers of Commerce reported a 118.5kWh battery, a WLTP range of up to 372 miles and around 9,000 Solihull staff trained for electrification.

What the other sites do

Whitley in Coventry is the global headquarters and the home of Powertrain Engineering. Gaydon is the principal design and engineering centre. Fen End, near Kenilworth, is the SV headquarters with a test track. Oxford Road at Ryton holds JLR Classic and the SV Technical Centre. Castle Bromwich is being expanded to press body panels for every brand.

Batteries and electric motors

JLR said in May 2024 that it had spent £356 million turning its i54 plant near Wolverhampton electric. By September 2026 the plant was making battery packs alongside combustion engines. At Hams Hall, near Coleshill, JLR's visitor page says the Battery Assembly Centre will use 4 million battery cells a day at capacity.

Staying near the work

Our nearest house to the Whitley headquarters is about 2 miles away by road. Ryton is about 3 miles, Fen End about 12 miles and Solihull about 17 miles, each measured from the nearest of the four homes.

Sources: media.jlr.com/corporate/news/2025/10/jlr-restarts-manufacturing-and-introduces-new-financing-solution-pay-jlr-suppliers; greaterbirminghamchambers.com/resource/jlr-unveils-first-fully-electric-range-rover-at-solihull-plant.html; careers.jaguarlandrover.com/where-we-are/united-kingdom. Distances by road from each house, worked out on OpenStreetMap.

Where to stay

Four whole houses in Stoke, Coventry

Humber Hub

4 bedrooms · 4 en-suites · sleeps 10 · Lower Stoke

Four bedrooms, each with its own en-suite, a big open-plan living room and kitchen, a private garden and free off-road parking.

Lower Stoke: four en-suite bedrooms, sleeps 10, free off-road parking.

Sullivan Heights

3 bedrooms · 1 bathroom · sleeps 6 · Upper Stoke

Three bedrooms, a bright living room with a corner sofa, a garden with a table and chairs and free parking on the street.

Upper Stoke: three bedrooms, sleeps six, a private garden.

Stoke Lodge

4 bedrooms · 2 bathrooms · sleeps 9 · Lower Stoke

A new-build house with four bedrooms, three king-size beds, two bathrooms, a garden through French doors and free parking on the street.

Lower Stoke: a new-build with four bedrooms and two bathrooms, sleeps nine.

FAQ

Quick answers

When did JLR restart production after the 2025 cyber incident?

The phased restart began on 8 October 2025.

Where is the Range Rover Electric built?

At JLR's Solihull plant, where it was unveiled in September 2026.

Which JLR site is closest to the houses?

Whitley, about 2 miles by road from Humber Hub.

Enquire

Ask about your dates

Send your dates and the number of guests and we will come back to you with availability and a price. For a business stay, add the company name and we will prepare a pro-forma invoice.

We use these details only to answer your enquiry. See our privacy notice.

Book or enquire

Tell us your dates and how many are coming. Choose a home if you have one in mind; we reply with availability and a price.

We use these details only to answer your enquiry. See our privacy notice.